Our Solutions:
Be assured that AES Global, Inc. can provide high quality automation solutions for your company, with a systems design team that is committed to the highest standards of excellence. Our registered engineers and highly experienced technical staff, develop innovative solutions designed to optimize the process, maximize the output, while adhering to the strictest quality of service procedures at cost-effective prices.
While our competitors wonder how our company is expanding at such remarkable growth; we are proud to show some of our newest developments on our clients’ sites within the past year. Here are just a few of our recent engineering projects:
City in Southern California
- Re-engineered and installed wireless SCADA
systems for the public works department - Designed a solar powered control panel that was
integrated into SCADA system. - Installed and configured a unified threat
management system to protect the city’s
SCADA network. - Resolved a communication interference issue
within the wireless SCADA network. - Enabled remote access to the SCADA system
allowing offsite access and control of the
SCADA system. - Utilized GPS co-ordinates and spectrum analyzers
to conduct a radio survey.
Results:
- Saved thousands of dollars by preventing the
overflowing of tank and reservoir, since the new
system can update and report real-time level &
alarming. - AES was able to reduce time required by
operators and maintenance crew. - Managed the level of water supply to meet the
level of demand effectively and efficiently. - Eliminated the remote system downtime due to
insufficient solar power. - Remote access of SCADA system from off-site
networks.
Bio Diesel Plant
- Integrated Meterwin tank gauging system.
- Modified temperature monitoring and control
system to obtain higher accuracy. - Installed a unified threat management system to
safeguard their plant control network. - Optimized the existing PLC program to improve
process performance and reliability. - Specified and integrated instrumentation to
improve process control. - Revised the HMI system to improve safety and
accessibility. - Provided continuous on-call engineering and
support.
Results:
- AES was able to reduce custody transfer time as
well as minimize down time, and generate faster
reporting and billing. - Improved PID control loop response, which in
turn produced higher quality bio-diesel. - Biodiesel production increased by 50%
- Revisions to HMI improved operator’s utilization
of the system to maximize their productivity.
Utility Plant
- Re-engineered the stand by generator
control system. - Upgraded the user interface and compiled it to
the control system via a touch screen. - Increased functionality of the load bank
simulation system. - Improved overall generator performance,
reliability and efficiency. - Provided remote load-shed capability using
Modbus over RS-422 serial communication.
Results:
- The new Generator Control System restored
lost functionality to obsolete, malfunctioning,
backup generator controls. - AES enabled the company to meet the state
regulated 5 second requirement for the
generators to come on line. - We added features that would allow for full
operational testing of the generator system. - The new touch screen operator interface gave
personnel more control with less navigation time
and was easier to use. - A renewed load shedding system gave the
control system the capability to remotely drop
loads from system.
Oil Corporation
- Implemented and integrated the Industrial
Defender Enterprise network security system to
protect their automation network. - Installed and configured a data historian
along with a web-enabled trending and
reporting package. - Developed and implemented custom leak
detection algorithm. - Redeveloped their HMI and SCADA monitoring
and control system. - Connected tank farm monitoring into the SCADA/
HMI system. - Provided continuous on-site engineering support.
Results:
- The company is now saves millions of dollars per
year as a result of AES’s turn-key solution. - AES was able to reduce custody transfer time as
well as minimize down time, and generate faster
reporting and billing. - With the help of new cutting-edge SCADA
systems, the company can now run two
tank-farms and two trading ports with minimal
operators and minute maintenance. - Operator training with the new system was
reduced from 21 days to 10 days.